"If the risk or cost of testing failover is too high, the risk of actual failure is too high.”

That has become a catchphrase of mine. It made me wonder:

"If the risk or cost of testing a contingency plan is too high, the risk presented by actual disaster is too high.”

These may not be equivalent in value or accuracy. Discuss?

(no subject)

Date: 2006-05-19 10:29 pm (UTC)
From: [identity profile] marsgov.livejournal.com
I can't really chat pre-Shabbat, but my philosophy is a bit different: Is a plan really needed to evacuate Chicgao? Is someone going to tell me I have to drive instead of bicycling (my current plan, BTW)?

I suspect that central planing may create more disaster than an unplanned evactuation.

Profile

doc_strange: (Default)doc_strange

April 2025

S M T W T F S
  12345
67891011 12
13141516171819
20212223242526
27282930   

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 12th, 2025 10:26 pm
Powered by Dreamwidth Studios