May. 19th, 2006

doc_strange: (Default)
"If the risk or cost of testing failover is too high, the risk of actual failure is too high.”

That has become a catchphrase of mine. It made me wonder:

"If the risk or cost of testing a contingency plan is too high, the risk presented by actual disaster is too high.”

These may not be equivalent in value or accuracy. Discuss?

Profile

doc_strange: (Default)doc_strange

April 2025

S M T W T F S
  12345
67891011 12
13141516171819
20212223242526
27282930   

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 27th, 2025 02:47 pm
Powered by Dreamwidth Studios